The system which had been negelected over a period of years was re-located to a new security and information office with cables re-routed and the system control re-configured.
Our proposals were immediately accepted by the site management and put into place by our engineers taking into account the constraints and restrictions on access to certain key areas of the site during business hours.
New cables were installed, amplifiers and microphones replaced and the system re-configured to enable it to be zoned if required. The system now functions in a more structured way with all circuits and cables identified, plus full documentation provided to assist in maintenance.